I decided to order the smaller kit for the P323 and it was big enough with material to spare.
For those that are not familiar with it, Spartite is a 2-part material you mix to fill the gap between the mast and deck and let it harden.
Process:
I built the dam (foam, clay, and masking tape) around the mast and poured in the material to fill about 1/4" over the collar.
I will try and write it up for the projects page. I took this photo when I removed the masking tape - I had put a wedge at the back of the mast to maximize a 360 degree seal around the mast. This was taken before I did the final trim and clean up. It looks to be a very water-tight solution and I am happy with the results.
